1, why the CQC reference standard or s very long?
A: for CQC application standard, we search the IEC standard, is not the latest version of PCB in national standard is equal to the IEC standard, release s mostly in 1990 and 1991.
2, after the official launch of the new standards, CQC will update?
A: yes, according to the national standard committee of planning, will officially issued the new standard by the end of the year. At the appointed time, cQc will also be revised according to the new standard.
3, PCB in the process of application CQC, is there a required for base material certification?
Answer: in terms of certification: PCB when applying for CQC certification, the base material of the CQC certification or certification number must be provided. However, given the current China's actual operation situation, CQC for ccL data passing through the UL certification as a reference. Company at the time of applying for cQc, along with all the will of base material uL certification and cQc certification. If the base material didn't pass any certification, so, must be CQC certification or random test base material.
4, basic application CQC certification process?
Answer: (1) on the cQc website complete qualified application materials. Note: PCB product categories are: non-metallic materials and components performance logo certification (134 kinds) printed circuit board in small classes (134001);
(2) the CQC product certification engineer for data review, cell division, is expected to deliver and test quotation, order to notice;
(3) the enterprise according to the requirements of standard sample preparation and CQC authorization to the lab for testing; At the same time, please pay;
(4)Circuit boards test result after testing organizations will report to China quality certification center;
Thanks, that was a really cool read!
ReplyDeleteAuto Insertion